Refreshment of seven bridges on the railway line T.G.M

The project consists in comforting or replacing seven (7) structures on the T.G.M railway line in the Governorate of Tunis.

This project is part of the upgrade of a high-performance rail network that meets international standards in this area.

The project is divided into two (02) lots.

The types of projected works of art are:

  • Five (05) Metal Bridges.
  • Two (02) Reinforced Concrete Bridges.
Business Areas:
Bridge
Client:
Tunisian Company of Transport (TRANSTU)
Country:
Tunisia
Year:
2020