The project consists in comforting or replacing seven (7) structures on the T.G.M railway line in the Governorate of Tunis.
This project is part of the upgrade of a high-performance rail network that meets international standards in this area.
The project is divided into two (02) lots.
The types of projected works of art are:
- Five (05) Metal Bridges.
- Two (02) Reinforced Concrete Bridges.